Problems that have arisen now
- According to my original script, the plot of the story was really too long due to the hand. I couldn’t finish the whole story this semester, so I chose the most critical episode for the previs, but I was hoping to use the previs process to help me organize my design ideas. I found some bugs in this cycle between the plot and characterisation, so I will try to balance the conflict between characterisation and body language in term three.
George’s Feedback
In week 9 I put all my energy into the production of the footage, in this class George also pointed out some problems I had with the rhythm of the footage, some of the footage rhythms were not edited well enough, so I will make changes next week.
sync sketch link: https://syncsketch.com/sketch/NTkxYjE1ZjE3/